Alteration/Addition/Revision/Revalidation of Building Plan

Alteration/Addition/Revision/Revalidation of Building Plan

  • Application
    • To apply online for Alteration/Addition/Revision/Revalidation of Building Plan click here
    • Please click here to refer GIDC- General Development Control Regulations & Addendum for building regulations
  • Documents

    Approval of plan has to be taken within 3 months from the date of issue of OCA letter.

    The following documents should be kept ready and submitted along with the request letter. The same is mentioned in the

    • Copy of Offer cum Allotment Letter/Or latest Transfer Order
    • Copy of Licence Agreement
    • Copy of Supplementary Agreement
    • Copy of Possession Receipt
    • Complete set of drawings proposed
    • Previously approved Complete set of drawing
    • Copy of Approved Field Book Sketch
    • Copy of Time limit extension order (if applicable)
    • PDF copy of plan (after approval)
    • As-Built Drawing

    Note : If necessary, GIDC will ask the applicant to submit other necessary documents to process the application

  • Scrutiny fee for Alteration/Addition/Revision/Revalidation of Building Plan is as follows:
    • Process fee – Rs. 0.20 / m2 for plot area
    • Scrutiny fee – Rs 5.00 / m2 for built up area
    • Service and amenities fee – Rs. 50.00 / m2 for built up area
    • Tree Plantation – Rs 500 / unit
    • Labour Cess and Non-violative fees as applicable
    • GST 18% as applicable
    • Total area of property after verification
    • Permissible built up area on the ground floor versus actual built up area proposed
    • Permissible FSI versus actual FSI consumed in proposal
    • Workers quarters area permissible versus proposed
    • Margins to be left as per GDCR versus margins left in proposed plan
    • Permissible height versus height proposed
    • Approval of factory inspector if required
  •  

  • Scrutiny Procedure

    Alteration/Addition/Revision/ Revalidation of Building plan approval application stages

    After application request is submitted along with required documents, GIDC will conduct site verification and prepare report for the same

    The following scrutiny is conducted on the proposed plans submitted by the applicant

    Note : Ideal time for processing a Plan Approval application without any queries post physical submission of application form and required documents at respective DEE office is as below:

    Process Ideal time
    Alteration/Addition/Revision/Revalidation of Building Plan 15 days

    Remarks : The procedural steps outlined above are uniform, consistent, and applicable across all types of establishments, regardless of their risk category, firm size/category (small, medium, large), business location (whether rural or urban), and the type of investor (whether foreign or domestic).