PM MITRA Park Gujarat

PM MITRA Park, Vansi – Navsari, Gujarat

An exclusive greenfield cluster for integrated textile and apparel manufacturing in Gujarat, backed by the state’s robust textile ecosystem.

Leveraging Gujarat’s leadership in cotton production, denim exports, and technical textiles, the park offers world-class infrastructure and seamless connectivity to global markets.

Land application through Gujarat Single Window – Investor Facilitation Portal.

Single Window Portal

Gujarat’s Single Window Portal is a one-stop digital platform for obtaining all business-related approvals, licences, clearances, and NOCs in a time-bound manner.

PM MITRA Park Guidelines


Salient Features – Infrastructure & Facilities

Water Supply – 65 MLDWater Supply – 65 MLD
Power SupplyPower Supply – (3 substations – 2 - 66KV and 1 - 220 KV)
cetp SupplyCETP + ZLD
stp SupplySewage Treatment Plant
tsdf SupplyIntegrated TSDF
boiler SupplyBoiler Steam Facility
common SupplyCommon Facility Centre
centre SupplyCentre of Excellence
plug SupplyPlug & Play Units
parking SupplyParking & Logistics

Project Location – Overview

Road Connectivity

SH 196 – 300 m, NH 48 – 30 km

Port Connectivity

Hazira Port ~65 km

Air Connectivity

Surat Airport ~55 km

Rail Connectivity

Navsari ~35 km

ICD Sachin

~40 km

CFS Hazira

~70 km


PM MITRA Park Layout – Tentative Masterplan

Total Area
1142 Acres
Allottable Area
686.28 Acres
Non-Allottable Area
455.72 Acres
Click to Download PDF

Environmental Clearance

Environmental Clearance for Park is received for Category B1 – Project/Activity Included Schedule No.: 7(c ) Industrial estates/ parks/ complexes/ areas, export processing Zones (EPZs), Special Economic Zones ,7(h) Common Effluent Treatment Plants (CETPs),7(d ) Common hazardous waste treatment, storage and disposal facilities (TSDFs)

Click to Download PDF

Key Benefits

Government Support

Joint initiative by Ministry of Textiles, Government of India, and Government of Gujarat.

Strategic Location

Strategically located near Gujarat’s textile cluster Surat and accessible to all modes of transport.

Skilled Workforce

Access to skilled labor force and availability of skill development centres.

Sustainable Operations

Green spaces and provision of infrastructure like CETP-ZLD, STP .


Gujarat’s Textile Policy 2024

Eligible Activities

Activity-1
  • Garments
  • Apparel and Made-ups
  • Technical Textiles Activity
    (including Composite Unit)
Activity-2
  • Weaving (with or without preparatory)
  • Knitting
  • Dyeing & Processing
  • Texturizing
  • Twisting
  • MMF spinning to manufacture yarn from Polyester Staple Fiber or Viscose Staple Fiber (excluding Spinning activity of Cotton and Synthetic Filament Yarn)
  • Embroidery
Gujarat Textile Policy 2024 GR (PDF) Gujarat Textile Policy Brochure 2024 (PDF)

Incentives provided to Textile Units

Incentive Category-1 and PM MITRA Park
Activity-1 Activity-2
Capital subsidy 35% of eFCI
up to INR 100 Cr
20% of eFCI
up to INR 50 Cr
Interest subsidy 7% on term loan for 8 years,
up to 3% of eFCI p.a.
7% on term loan for 7 years,
up to 2% of eFCI p.a.
Power tariff subsidy INR 1/unit for availing power from either from DISCOM or Renewable Power through open-access for 5 years from DoCP
Payroll assistance
  • Garment, Apparel and Made-ups: INR 5,000 per female worker & INR 4,000 per male worker per month for 5 years
  • Technical textile (including composite unit): INR 3,000 per female worker & INR 2,000 per male worker per month for 5 years
Assistance to SHG for job work
  • Training assistance: INR 5,000 per month per member for 3 months
  • Payroll assistance: 25% of job work value turnover up to INR 5,000 per month per member for 5 years

Incentive Category-1 and PM MITRA Park
Activity-1 Activity-2
Capital subsidy 35% of eFCI up to
INR 150 Cr
25% of eFCI up to
INR 150 Cr
Interest subsidy 7% on term loan for 8 years, up to 3% of eFCI p.a.
Power tariff subsidy INR 1/unit for availing power from either from DISCOM or Renewable Power through open-access or drawl of power from group captive renewable energy plant up to INR 15 Cr/year for 5 years from DoCP
Payroll assistance
  • Garment, Apparel and Made-ups (including composite unit): INR 5,000 per female worker & INR 4,000 per male worker per month for 10 years
  • Technical textile (including composite unit): INR 3,000 per female worker & INR 2,000 per male worker per month for 10 years
Assistance to SHG for job work
  • Training assistance: INR 5,000 per month per member for 3 months
  • Payroll assistance: 25% of job work value turnover up to INR 5,000 per month per member for 5 years

PM MITRA Park Cell

Ms. Praveena D.K., IAS
Vice Chairperson & Managing Director
Shri H. R. Menat
Chief Engineer
Shri Parth Suthar
Superintending Engineer (HO)
Shri Devendra B. Sagar
Superintending Engineer (Surat)

Download GIDC Setu Mobile Application

Back to top