Plan Approval

  • Application
    • To apply online for Plan Approval click here
    • Please click here to refer GIDC- General Development Control Regulations & Addendum for building regulations
  • List of Authorized architects *

    * GIDC has authorized all architects/engineers empanelled with AMC, AUDA, SUDA & RUDA to sign self-certificate for plinth check & Building Utilization.

  • Documents Checklist

    Approval of plan has to be taken within 3 months from the date of issue of OCA letter.

    The following documents should be kept ready and submitted along with the request letter. The same is mentioned in the

    • Copy of Offer cum Allotment Letter/Or latest Transfer Order
    • Copy of Possession Receipt
    • Copy of Approved Field Book
    • Copy of Time limit extension order (if applicable)
    • PDF copy of plan (after approval)

    Note : If necessary, GIDC will ask the applicant to submit other necessary documents to process the application

  • Computerised Risk Assessment system

    For the purpose of obtaining Plan Approval a computerised risk assessment system has been introduced as per guidelines provided by DIPP under Government of India’s initiative of Ease of Doing Business (EODB). During scrutiny of the submitted building plan the unit shall be categorized into High, Medium and Low risk as per the following parameters and site investigation schedule will be generated by the computer accordingly to schedule site investigation Click Here

  • Sr. No Category Parameter-1 Parameter-2 Risk Category Inspection Requirement
    Type of Industry Area (Sqm)
    1 GIDC-CA-I Chemical 25,000 and above High Risk Yes
    10,000 up to 25,000 High Risk Yes
    less than 10,000 Medium Risk Yes
    2 GIDC-CA-II Petro-chemical 25,000 and above High Risk Yes
    10,000 up to 25,000 High Risk Yes
    less than 10,000 Medium Risk Yes
    3 GIDC-CA-III Engineering 25,000 and above Medium Risk Yes
    10,000 up to 25,000 Medium Risk Yes
    less than 10,000 Low Risk No
    4 GIDC-CA-IV Other 25,000 and above Medium Risk Yes
    10,000 up to 25,000 Low Risk No
    less than 10,000 Low Risk No
  • Scrutiny Procedure

    After application request is submitted along with required documents, GIDC will conduct site verification and prepare report for the same

    The following scrutiny is conducted on the proposed plans submitted by the applicant

    • Total area of property after verification
    • Permissible built up area on the ground floor versus actual built up area proposed
    • Permissible FSI versus actual FSI consumed in proposal
    • Workers quarters area permissible versus proposed
    • Margins to be left as per GDCR versus margins left in proposed plan
    • Permissible height versus height proposed
    • Approval of factory inspector if required
  • Note : Ideal time for processing a Plan Approval application without any queries post physical submission of application form and required documents at respective DEE office is as below:

    Process Ideal time
    Plan approval with or without site verification 30 days from date after required compliances are made by Applicant
  • Download Checklist for Site Verification : Click Here
  • Download User Manual for Smart DCR : Click Here